Maximising Resources with Job Hints

  • Updated

BigChange provides various insights when you create or schedule a job. These insights, known as job hints and statistics, are based on the contacts you enter when creating a job. This article will guide you through understanding and utilising these features effectively.

Job Hints

  • Notification of Jobs: You are notified of jobs either waiting to be scheduled or already booked at the same site. This allows you to potentially complete additional work simultaneously, thereby reducing travel costs.
  • Job Hints Details: When a job is created and a contact is entered, a new hint appears detailing the number of jobs scheduled to start within the next seven days and those created but not yet scheduled.

JobHint1.png

  1. Job Hint suggestion
  2. Locating Unscheduled Jobs: To easily locate unscheduled jobs: Select the eye icon next to the contact.
    • a. Select jobs.
    • b. From the job status, select unscheduled.
    • c. Unscheduled jobs list view.

JobHint3.png

  1. Changing Time Period for Job Hints: If you wish to change the time period used in the job hints from seven days:
    • Log in as an administrator.
    • Select Account settings.
    • Select Settings.
    • Select General Account Settings.
    • Under section Schedule
      • Number of days in future to hint of jobs at same contact
      • Default minimum number of jobs that must be completed before resource is displayed on job hints

JobHint4.png

Job Statistics

  • Job Statistics Overview: When a job is created and a job type is entered, statistics can be seen stating the average duration for that job type.

JobHint2.png

  • Viewing Top Performance:
    1. Select the View Top Performance link to see the fastest resources, best success rate, and most punctual resources.
    2. Use the prompts in the pop-up to filter resources based on specific groups and change the number of jobs used to provide the insight.

JobHint5.png

  • Changing Default Number of Jobs: The default number of jobs can be changed in the administration settings.
  • Combining Job Type with Resource: When combining a job type with a particular resource, you can see:
    • Average completion time for that resource.
    • Success rate.
    • Punctuality.
JobHint6.png
  • Job statistics are updated at midnight.
  • Statistics are only displayed if there are more than five previously completed jobs in your system per resource, job type, and time stock combination.

Conclusion

By utilising job hints and statistics in BigChange, you can optimise job scheduling and resource allocation, ultimately improving efficiency and reducing costs. Ensure you regularly review and adjust your settings to make the most of these insights.

 

Video

 

 

Was this article helpful?

0 out of 0 found this helpful

Comments

0 comments

Please sign in to leave a comment.