The maximum time a job can be scheduled for in BigChange is 24 hrs. If a job is going to extend over a number of days, then the recommended option is to set it up using the  'Multiple jobs' field in the 'New job' window:

57.png

When selecting Multiple Jobs, you must always add at least one Job prior to saving. You can do this either by creating a new job or by importing an existing job using the Job reference:

58.png59.png

Once a job has been added, you can now set a recurrence:

60.png

This will automatically add the other jobs into the Schedule:

61.png62.png

 